Reference project

Large-Scale Battery Storage Facility in Aachen

Old Industry Gets a New Lease on Life: Trading Storage at TRIWO Park

A large-scale battery storage facility is being built on the site of the former Philips factory in TRIWO Park Aachen, utilizing the existing grid connection capacity of a substation. The storage facility trades electricity on the day-ahead and intraday markets and provides balancing power. Voltfang is implementing the project as a full-service EPC contractor and will handle technical operations.

Capacity

21 MWh

Performance

10 MW

Storage duration

2 h

Grid connection

Medium voltage (10 kV)

Location

Aachen, North Rhine-Westphalia

Under construction

Project Overview

One warehouse, three markets

The 2h storage system performs cross-market optimization: physical and virtual trading on the day-ahead and intraday markets. In addition, the storage system provides primary control power (FCR) and secondary control power (aFRR), thereby stabilizing the power grid. It charges and discharges flexibly and balances out fluctuations in the grid.

Day-Ahead & Intraday Trading
Physical and Virtual Trading
Regulating Power (FCR/aFRR)
Contribution to Grid Stability
Cross-Market Optimization
Markets are combined rather than served individually

Old Industry, New Infrastructure

Where electronics were once manufactured, a storage facility will stabilize the grid in the future

The site was previously used for industrial purposes by Continental and Philips. Due to the decline in energy-intensive manufacturing, connection capacity has become available there, which the storage facility utilizes via the existing substation. Instead of developing new sites, the existing grid infrastructure is being reused.

That saves time

≥ 5 years

Standalone large-scale storage systems with a capacity of 1 MW or more are generally awaiting a new grid connection.

In the past

Energy-Intensive Electronics Manufacturing by Continental and Philips

↓

Today

Large-scale battery storage facility at the existing substation

Technology and Key Specifications

Voltfang's Scope of Services

1

Planning and System Integration (Full-EPC)

One-stop planning and implementation of the project

2

Battery Systems

Delivery of the Voltfang 3+ Battery Containers

3

Technical Operations

Voltfang will take over the long-term technical operation of the facilities

“

This is where old industry meets new.

David Oudsandji, CEO and co-founder of Voltfang