Home References AWA Warden Waste Management Center
Reference project
AWA Entsorgung – Electrification of the Warden Waste Management Center
At the Warden Waste Management Center in Eschweiler (NRW), trucks, excavators, and wheel loaders are increasingly running on electricity—charged with up to 400 kW from onsite solar and landfill gas power. Energy costs fall by up to 82% per year, bringing AWA significantly closer to its climate targets. This is made possible by a battery storage system from Voltfang that intelligently coordinates generation, charging infrastructure, and consumers.
Company
- Company: AWA Entsorgung GmbH
- Location: Eschweiler, North Rhine-Westphalia
- Industry: Waste Management & Municipal Services
“We have been generating our own electricity on site for years. Thanks to the storage system, we can deploy it precisely as needed—exactly when our plant, vehicles, and machinery require it.”
– Maren Killewald, Managing Director, AWA Entsorgung GmbH
The project in figures
One battery storage system, four tasks
Voltfang designed a storage system for Warden that covers four use cases simultaneously. Everything is managed via the Voltfang energy management system (EMS), which controls generation, charging infrastructure, and consumers in a unified system.
The diagram shows how energy flows across the site depending on the task the storage system is currently performing: peak shaving, bridging CHP outages, supporting charging infrastructure, and optimizing self-consumption.
Absorb load peaks and reduce strain on the grid connection. The battery covers charging peaks so the connected load does not have to scale to peak demand.
Short-term compensation during outages or maintenance of the landfill gas CHP plant. The site remains powered without drawing unexpected power from the grid.
Providing additional capacity for charging vehicles—up to 400 kW is available on site, including for heavy commercial vehicles.
Utilizing generated PV electricity for buildings, the leachate treatment plant, and the increasingly electrified fleet and machinery.
Modular construction – keeping pace with electrification
The site started with a single storage unit and was gradually expanded to three units with a combined capacity of 540 kWh and 270 kW output. Each expansion phase followed the actual progress of the vehicle fleet.
The advantage for operational depots: the storage system grows with the fleet. Investments are made step by step according to actual demand—instead of upfront spending on a system that will only reach full capacity years later. This keeps the site flexible for future expansion stages as well.
Our energy storage solution
Capacity
540 kWh
Performance
270 kW
Additional reference projects
More projects where Voltfang implemented battery storage systems for commercial, industrial, and municipal clients—from logistics and steel trading to EV charging hubs.