Reference project

Alsdorf Large-Scale Battery Storage Facility

Medium-Voltage Trading Storage

At the Regionetz substation in Alsdorf, Voltfang stabilizes the power grid and sells electricity on the short-term markets. The large-scale battery storage facility is operational and combines day-ahead and intraday trading with balancing power. Voltfang implemented the project as a full-EPC contractor and is responsible for its technical operation.

Capacity

20.34 MWh

Performance

9.5 MW

Storage duration

2 h

Grid connection

Medium voltage

Location

Alsdorf, North Rhine-Westphalia

In operation

Project Overview

One warehouse, three markets

The large-scale battery storage system is primarily used for grid services and electricity trading. Cross-market optimization generates arbitrage profits in the day-ahead and intraday markets. The storage system charges when prices are low and grid load is high, and discharges when prices are high and supply is tight. In addition, the 2-hour storage system provides primary and secondary control power (FCR/aFRR) and stabilizes the transmission system operator’s grid frequency.

Day-Ahead & Intraday Trading
Arbitrage Profits Through Dynamic Price Response
Control Power (FCR/aFRR)
Contribution to Frequency Stability
Energy Trader
Control via the Voltfang Energy Trader Algorithm

Technology and Key Specifications

Voltfang's Scope of Services

1

Implementation (Full EPC)

One-stop planning and implementation of the project

2

Battery Systems

Delivery of Voltfang Battery Storage Systems

3

Technical Operations

Voltfang will serve as the technical operator of the BESS

“

Energy storage systems of this scale are crucial for the stability of our power grid and the security of supply for German industry.

Afshin Doostdar, CTO and co-founder of Voltfang