Reference project
Transformation at the filling station
JET and Voltfang demonstrate the future of electromobility in Hamburg: A 300 kW HPC fast charging station with Voltfang battery storage enables ultra-fast charging – without any expensive grid expansion.
Fast charging station at JET
- Company: JET
- Location: Hamburg
- Industry: Electric mobility / Charging infrastructure
Benefits for JET
Implemented use case
The battery storage serves as a power buffer for an HPC charging station to enable ultra-fast charging despite a limited grid connection. This solution is particularly relevant for petrol station locations or other charging hubs where the power grid is not sufficiently dimensioned and grid expansion would be costly or time-consuming.
Aim of the project
JET wanted to make its Hamburg filling station location fit for electromobility and provide 300 kW charging power – without having to expand the existing 80 kW grid connection. The aim was to avoid grid congestion, reduce costs and approval times and at the same time pave the way for climate-friendly mobility hubs.
Our customized solution
The Voltfang second-life storage system installed has a capacity of 90 kWh and an output of 45 kW. It reliably stores the PV electricity generated and provides this flexibly for the packaging machines and charging infrastructure at the site.
Our energy storage solution
Capacity
360 kWh
Performance
300 kW
Additional reference projects
Below, we present additional reference projects where a Voltfang battery storage system has been implemented. These projects can encompass a variety of applications and industries, including hospitality, agriculture, bakeries, and supermarkets.
Packaging industry Kemapack
Mechanical engineering Myrenne
Steel trade Kerschgens
Stuttgart Airport
PV and charging park
Apartment building
McDonald’s
Grunwald Farm
Hotel zur Post
How our approach works